en English

HIGH-RISE BUILDINGS AUTOMATED REPORTING

Comprehensive reports on the performance of solutions are available on-line and easily downloaded

Currently, 17 different types of reports can be browsed on-line – complete with coloured diagrams and detailed numerical data. Users are able to modify and edit the page headers and footers to include their own organisation name and logo etc. Click the report title below to find out more details, or view the sample report (pdf file, 2.26MB).

Average Times
Average waiting time (AWT), transit time (ATT), time to destination (ATTD) and journey time (AJT) throughout the simulation time.   Average Times
Histogram (AWT, ATT, ATTD, AJT)
Average waiting time (AWT), transit time (ATT), time to destination (ATTD) and journey time (AJT) as histograms (frequency diagrams).   Average Transit Time Average time to destination Average Waiting Time
Average Loading

Average car loading, on arrival or departure, throughout the time of simulation.

 

 
Interval on Arival
Interval on Departure

Passenger Demand

Passenger demand, up or down, throughout the time of simulation.

 

Passenger Demand

Passenger Activity
Activity of passengers – incoming, outgoing and interfloor, throughout the time of simulation.   Passenger Activity
Passenger Transfer
Passenger transfer, loading and unloading, throughout the time of simulation.   Passenger Transfer
Dispatch Interval

Average despatch interval throughout the time of simulation.

 

Dispatch Interval

Intermediate Stops

Number of intermediate stops, average and maximum, throughout the time of simulation.

 

Intermediate Stops

Spatial Plot

Number of intermediate stops, average and maximum, throughout the time of simulation.

 

Spatial Plot

Passenger Queue Plot

Passenger number over the time of simulation.

 

Passenger Queue Plot

Passenger Queue Length

Passenger queue lengths over the time of simulation – average and maximum.

 

Passenger Queue Length

Lift Trip Count

Lift trip count for all lifts in a group.

 

Lift Trip Count

Round Trip Time

Round trip time throughout the time of simulation.

 

Round Trip Time

Round Trip Stops

Number of round trip stops throughout the time of simulation.

 

Round Trip Stops

Lift Activity

Lift activity – running, idle, passenger transfers – throughout the time of simulation.

 

Lift Activity

Energy Consumption

Energy consumption, both regenerative and non-regenerative, throughout the time of simulation.

 

Energy Consumption

Passenger List

Detailed passenger list

 

Passenger List